24-hour TSP Monitoring Results
Station CM_WF1a, The Wah Ming House
                                   
Start Finish Weather Filter Weight (g) Elapsed Time Reading Sampling Time Flow Rate (m3/min) TSP Conc. Action Level Limit Level Observations / Remarks Sampler Filter
Date Time Date Time   Initial Final Initial Final (hrs) Initial Final Average  (µg/m3)  (µg/m3)  (µg/m3)   ID ID
03-Dec-13 13:28 04-Dec-13 13:28 Fine 2.7946 2.937 6323.93 6347.93 24.00 1.0434 1.0434 1.0434 95 185.3 260 Tunnel works Wah Fu 1723
09-Dec-13 08:00 10-Dec-13 08:00 Fine 2.7995 3.0726 6347.92 6371.92 24.00 1.0366 1.0366 1.0366 183 185.3 260 Tunnel works Wah Fu 1730
13-Dec-13 08:00 14-Dec-13 08:00 Fine 2.782 3.0416 6371.91 6395.91 24.00 1.0424 1.0424 1.0424 173 185.3 260 Tunnel works Wah Fu 1737
19-Dec-13 08:00 20-Dec-13 08:00 Fine 2.7914 2.8822 6395.90 6419.90 24.00 1.0547 1.0547 1.0547 60 185.3 260 Tunnel works Wah Fu 1744
24-Dec-13 08:00 25-Dec-13 08:00 Fine 2.7805 2.9807 6419.90 6443.90 24.00 1.0510 1.0510 1.0510 132 185.3 260 Tunnel works Wah Fu 1750
30-Dec-13 08:00 31-Dec-13 08:00 Fine 2.779 3.0263 6443.90 6467.90 24.00 1.0523 1.0523 1.0523 163 185.3 260 Tunnel works Wah Fu 1758